2012 China (Guangzhou) International Food Packaging Machinery Exhibition (17th): Notes for CMPF2012 Exhibitor Dismantling

I. Exhibitors' Extended Precautions

1. Move-out time: November 3, 2012 afternoon

2. Dismantling regulations:

A. Dismantling shall not be carried out before the time of dismantling.

B. During the period of dismantling, the exhibitors shall keep the exhibits themselves.

C. During the dismantling period, no packaged service may be set up in the exhibition hall.

D. For the exhibited samples that have been packaged, they must obey the command of the staff and evacuated the exhibition in an orderly manner. All the participating samples cannot be exported.

E. Exhibits must be removed from the exhibition hall by direct loading and removal. Exhibits must not be placed at the entrances or roadsides, and they must not be placed in the periphery so as to avoid affecting the successful evacuation of the exhibits. Otherwise, the exhibition hall has the right to treat them as cleaning materials.

F. All exhibitors and exhibitors that are on their own shall be evacuated by the exhibitor when dismantling the exhibition. They must not be piled up inside or outside the exhibition hall. Otherwise, they will be treated as discarded articles.

G. Vehicles carrying the exhibits must be subject to the security of the assembly and the dispatch of the staff. The driver must not leave the car and it is forbidden to stop.

H, protect all facilities in the museum, not allowed to move away, not damage to the ring, and offenders should be compensated according to price, severe cases will increase the fine depending on the circumstances.

3. Disposal contractor's notice

A. The specific time for the dismantling of the conference will be sponsored by the conference and the organization will send it to the main contractor of the conference. Each contractor shall consult with the main contractor of the conference for the specific time. If there is any sign of early dismantling by the contractor, the organizer of the conference and the main contractor of the conference have The right to a fine, the amount of fines from the clearing deposit deduction.

B. The basic process of dismantling the exhibition is: Dismantling of the organization's organization units by broadcasting → Execution of each contractor's supervisor to assist exhibitors in completing the dismantling work → After the dismantling of the broadcasting for one hour, the general assembly stand will be suspended. → Each contractor will confirm the situation in the stand. You can open up and down the booth (remember the security issues). → Take the booth waste away or place it on the designated site of the exhibition hall.

C. The booth contractor should be aware that in any case, the booth contractor will be allowed to push the booth down to the stand of dismantling the booth. If any such situation is found, the venue, the organizer of the conference and the main contractor of the conference shall have the right to impose fines on their actions. Deducted from the clearing deposit.

Second, the exhibition visit contact information

Address: No. 2510-12, Tower B, Fengxing Plaza, No. 242 Tianhe Road, Guangzhou

Domestic exhibitors 020-85509083/38395653

Overseas exhibitors: 0086-20-38395852

Visit consultation / 38395526

》 Autumn Exhibition Official Website:

CMPF 2012 official website: http://

INTERFOOD 2012 official website: http://

WINEFAIR 2012 official website: http://

Next year's show notice, so stay tuned!

》Spring Show Official Website:

CMPE2013: http://

CIFE2013: http://

WINEXPO2013: http://

[2+1] Organization Committee

Direct Acting Solenoid Valve

Direct Acting Solenoid Valve,Direct Acting Water Solenoid Valve,Direct Acting 3-way Solenoid Valve

Covna Automation Industry Co., Ltd. , http://www.gd-valves.com